Charleston's Premier Fine Art & Antique Auction House
- Home
- Contact
- Auctions
- Past Auctions
- October 2021 Auction
- Spring 2021 Auction
- April 2021 Auction
- June 2021 Auction
- August 2021 Auction
- March 2021 Auction
- February 2021 Auction
- January 2021 Auction
- 2020 Holiday Jewelry Auction
- December 2020 Auction
- October 2020 Auction
- September 2020 Auction
- August 2020 Auction
- June 28th Auction
- May 31st Auction
- May 3rd Spring Auction
- February 2020 Auction
- March 2020 Auction
- December 2910 Auction
- Holiday Jewelry Auction
- January 2020 Auction
- October 2019 Auction
- September 2019 Auction
- August 2019 Auction
- June 2019 Auction
- June 2, 2019 Auction
- April 2019 Auction
- March 2019 Auction
- February 2019 Auction
- January 2019 Auction
- December 2018 Auction
- October 2018 Auction
- September 2018 Auction
- August 2018 Auction
- June 24th 2018 Auction
- June 3rd 2018 Auction
- April 2018 Auction
- March 2018 Auction
- February 2018 Auction
- January 2018 Auction
- Holiday 2017 Auction
- October 2017 Auction
- September 2017 Auction
- August 2017 Auction
- June Auction
- May Auction
- April Auction
- February Auction
- March 2017Auction
- January 2017 Auction
- November 2016 Auction
- October 2016 Auction
- Charlotte Street
- August 2016 Auction
- September 2016 Auction
- July 2016 Auction
- June 2016 Auction
- February 2016 Auction
- The April Auction
- May 2016 Auction
- The Fall 2015 Auction
- The Holiday 2015 Auction
- The May 2015 Auction
- December 2021 Auction
- Past Estate Sales
- Consign
- About
- Home
- Contact
- Auctions
- Past Auctions
- October 2021 Auction
- Spring 2021 Auction
- April 2021 Auction
- June 2021 Auction
- August 2021 Auction
- March 2021 Auction
- February 2021 Auction
- January 2021 Auction
- 2020 Holiday Jewelry Auction
- December 2020 Auction
- October 2020 Auction
- September 2020 Auction
- August 2020 Auction
- June 28th Auction
- May 31st Auction
- May 3rd Spring Auction
- February 2020 Auction
- March 2020 Auction
- December 2910 Auction
- Holiday Jewelry Auction
- January 2020 Auction
- October 2019 Auction
- September 2019 Auction
- August 2019 Auction
- June 2019 Auction
- June 2, 2019 Auction
- April 2019 Auction
- March 2019 Auction
- February 2019 Auction
- January 2019 Auction
- December 2018 Auction
- October 2018 Auction
- September 2018 Auction
- August 2018 Auction
- June 24th 2018 Auction
- June 3rd 2018 Auction
- April 2018 Auction
- March 2018 Auction
- February 2018 Auction
- January 2018 Auction
- Holiday 2017 Auction
- October 2017 Auction
- September 2017 Auction
- August 2017 Auction
- June Auction
- May Auction
- April Auction
- February Auction
- March 2017Auction
- January 2017 Auction
- November 2016 Auction
- October 2016 Auction
- Charlotte Street
- August 2016 Auction
- September 2016 Auction
- July 2016 Auction
- June 2016 Auction
- February 2016 Auction
- The April Auction
- May 2016 Auction
- The Fall 2015 Auction
- The Holiday 2015 Auction
- The May 2015 Auction
- December 2021 Auction
- Past Estate Sales
- Consign
- About
Charleston Blog
The Cooper River Bridge
Posted on May 8, 2014 at 12:05 AM |
The Ravenel Bridge....
Recently, CEA partner, Mark Bastian, was running the Cooper River Bridge and wondered a little about its history... here is what we could find. A great story for a historic bridge connecting downtown Charleston to Mt. Pleasant since 1929....
The first bridge to cross the lower Cooper River opened in 1929, eventually named the John P. Grace Memorial Bridge for former Charleston mayor John P. Grace, who spearheaded the project. The main span of the double cantilever truss bridge was the fifth longest in the world at 1,050 feet (320 m) and soared 150 feet (46 m) above the river. The main span of the second cantilever was the twelfth-longest in the world. The total length of the structure was about 2.7 miles (4.3 km). Following a 17 month construction at a cost of $6 million, it opened with a 3 day celebration that attracted visitors from around the globe. Engineers and critics proclaimed colorful descriptions of the unique structure, deeming it "the first roller-coaster bridge" and citing that "steep approaches, stupendous height, extremely narrow width, and a sharp curve at the dip conspire to excite and alarm the motorist." Privately owned originally, a $1.00 toll was charged for car and driver to cross. In 1943 the state of South Carolina purchased the bridge, and the tolls were lifted in 1946.
By the 1960s the Grace Memorial Bridge had become insufficient, with its two narrow 10-foot (3 m) lanes built for Ford Model A's and its steep grades of up to 6 percent. A new bridge was constructed alongside and parallel to it. Named for the then-South Carolina Highway Commissioner, the Silas N. Pearman Bridge opened in 1966 at cost of $15 million. Its three lanes, at a modern 12-foot (3.7 m) width, opened to northbound traffic while its older counterpart carried the southbound traffic into downtown Charleston. One lane was reversible on the Pearman bridge, which led to signs warning "Use lanes with green arrow" and "Do not use red X lane" on the bridge.
The two truss bridges had become functionally obsolete by 1979. Extensive metal deterioration caused by the lack of maintenance shortly after Grace Bridge's tolls were removed limited the capacity of the older Grace bridge to ten ton vehicles (later five tons), and the reversible lane on the Pearman was eliminated (it had been able to switch to three lanes northbound for rush hour traffic), making that lane southbound permanently, diverting all heavy trucks, buses, and recreational vehicles to that lane on the Pearman bridge. Neither of the bridges had emergency lanes, and the Pearman bridge had no median between the northbound and southbound lanes because of its reversible lane, and it was not until 2002 when flexible barriers were added to the Pearman bridge to prevent head-on collisions.
Furthermore, the vertical clearance above the river – once among the highest in the world – could no longer accommodate modern shipping vessels. Three of Charleston’s four shipping terminals are situated up the Cooper and Wando Rivers, and the limited bridge clearance excluded the access of ships that would otherwise be beneficial to the economy of South Carolina. Now that the old bridges are disassembled, the world’s largest modern container ships are able to access all terminals of the nation's fourth-largest container port.
The Arthur Ravenel Jr. Bridge, also known as the New Cooper River Bridge, is a cable-stayed bridge over the Cooper River in South Carolina, connecting downtown Charleston to Mount Pleasant. The eight lane bridge satisfied the capacity of U.S. Route 17 when it opened in 2005 to replace two obsolete cantilever truss bridges. The bridge has a main span of 1,546 feet (471 m), the third longest among cable-stayed bridges in the Western Hemisphere. It was built using the design-build method and was designed by Parsons Brinckerhoff.
Groundbreaking on the bridge occurred in 2001 in Mount Pleasant. The bridge was built as a design-build project, meaning that one contract was signed to both design and construct the bridge. This meant that construction could begin even while the design was not yet finalized. The bridge was built by a joint venture of two major construction firms operating under the name Palmetto Bridge Constructors. The joint venture partners were Tidewater Skanska of Norfolk, Virginia and Flatiron Constructors of Longmont, Colorado. The construction joint venture hired Parsons Brinckerhoff to complete the design. For the sake of simplifying labor and equipment resources, Palmetto Bridge Constructors actually managed the building of the bridge as five separate projects (the two highway interchanges at either end of the bridge, the two approach spans, and the cable-stayed span) going on simultaneously.
By the summer of 2002 the foundations for the towers and most of the piers were in place and the rock islands were completed. The steel and concrete towers began to ascend from the islands soon after. Originally, each of the towers was to be topped with a 50-foot (15 m) multicolored LED "beacon," but public opinion caused this plan to be scrapped.
The first cables were hung from the towers in 2004—as a time-saving measure, this was done before the towers were wholly completed. Sections of the deck were built outward from each of the towers as more cables were hung.
Fireworks celebration, July 2005, to kick off the new bridge.
The decks of the approaches were taking shape as well. Construction of part of the roadway actually occurred over the top of the old cantilever bridges, which remained open to traffic without interruption.
A ceremony was held in March 2005, when the last slab of the deck was added, thus making the bridge "complete." But paving, installation of lights and signs, and cleanup meant that the bridge would not open for another four months.
Following a week-long celebration that included a public bridge walk, concerts, dinners, and fireworks, the bridge was dedicated and opened on July 16, 2005 – one year ahead of schedule and under budget. The bridge was featured on the TV show Extreme Engineering.
Categories: Downtown Charleston